26 m LOA Trawler Fishing Vessel “Rachel Jay”

Complete Modernisation Change the steel of all upper deck, carry out a complete electric installation, carry out a complete new accommodation (galley, mess-room, toilets, cabins, stores, wheelhouse), build and install a new aluminium wheelhouse, complete overhaul...

Cidade de Albufeira

Fishing reform  Works done: – Hull cleaning and painting – Reform of the fishing area – Conveyor installation – Several works in habilitation – Installing a winch in bridge – Hold...

FlinterSun & FlinterStar

Works done: – Change ventilation dicts of the hold for levelling it with the hatch lids, repairing leakage at hold, leakage hydraulic oil pipe, etc.  Others works done: – Name painted on the side – Tank leak repair – Pipe repair – Lower...

Lengthening

We can make lengthenings of any type of vessel Lengthening of trawler fishing vessel from 22 m LOA to 24,5 m...