120 mts LOA Cargo Vessel “Sua”

Dry docking for repair and maintenance works Washing, painting, change cathodic protection, check valves, check shaft line and steering gear, sand-blasting, change pipes and valves, overhaul main machinery and pumps, electric works, steel works, extension and...