Works done:
– Change ventilation dicts of the hold for levelling it with the hatch lids, repairing leakage at hold, leakage hydraulic oil pipe, etc.
Others works done:
– Name painted on the side
– Tank leak repair
– Pipe repair
– Lower height handrails