Fishing Vessel called “Madre Consuelo”

Dry docking for change of main engine  Open cesarean section in one side of the hull for taking out the old main engine, dismantle the old main engine, dismantle the pipes related to the main engine in engine room, place inside the new main engine, install the pipes...

118 mts LOA Cargo Vessel called “Gures”

Dry docking for repair and maintenance works Cleaning, sand-blasting and painting of the hull, steel works, change cathodic protection, check the valves, check the shaft line and rudder, overhaul windlass, pipe works, cleaning chain locker, cleaning box cooler,...