Dry docking, repair, maintenance and painting works
Main Particulars:
– Length Overall 25 mts
– Length BP 20.90 mts
– Breadth 7.50 mts
– Depth 4.20 mts
Main Works carried out:
– Repair/rebuild cooker and tile galley
– Renewal floor in mess room area
– Some accommodation repairs
– Repair in skippers cabin
– Repair in toilet
– Manufacturer the support for emergency lights for the liferafts
– Renewal the cable support in work area main deck
– Repair and reinforcement below upper deck around the forward port side winch
– Renewal steel support aft area
– Prepare the stainless steel structure for protect the access for the cargo hold hatches
– Prepare one bilge case in main deck
– Washing the hull and painting
– Painting outside and inside the vessel
– Deck treatment
– Paint engine room
– Open sea chests for cleaning
– Free all fuel shut off valves
– Dismantling and overhaul all sea valves and discharges
– Electric motors fan in engine room starboard side
– Service CO2 system
– Change some sea water pipes in engine room
– Change some handrail on port side
– Change some hydraulic pipes in main deck and upper deck
– Remove and installation the rubber for treatment upper deck
– Change the hydraulic cylinder crane
– Change joints on doors and hatches
– Manufacturer new drawers and shelves wheelhouse
– Etc