Dry docking for repair and maintenance works
Works carried out:
– Washing
– Painting
– Change part of the cathodic protection
– Check valves
– Cleaning some filters
– Cleaning coolers main engine
– Change some pipes
– Assemble and disassemble botton plugs
– Checking, calibration, pressure cleaning, lower and extension of chains
– Etc